Description: Filling the annulus space of the J-tube in order to seal the leak at the bell-mouth; as sub-contractor for Saipem SA.
Description: STOPAQ Steam Heated Tank Container on board at the Platform
Description: Filling Connection together with a venting connection.
Description: Special designed traced pumps
Description: Insulated hozes from Heated tank container to filling place on top of the J-Tube. The J-Tube is 50 meter long from Platform to Seabed.
Description: The Installation Crew ready to pump and displace the water.
Description: So called tool-box meeting at the special shipped STOPAQ Tool Box.