Description: Pipeline in the Ditch
Description: Classroom Corrosion School
Description: Practical Application Room for Examinations
Description: Inspection of built-up FN4100 Application
Description: Full equipped Class Rooms for 22 persons
Description: Close-up of a Flange Application by FN4100
Description: Field Joint Application Demonstration
Description: Valve Demo
Description: Explanations above ground Flanges
Description: Soil stress Coating Test area at a 24 inch piping. Pipe can be heated up to 90 degrees C.
Description: