Case Histories

1.
Owner : Oman Gas Company
Contractor : MS Galfar
Repair : sintered PE Pipelines
Size : > 7000m
Date : 1995
System : Wrappingband CZH + STOPAQ Polyester

2.
Owner : Shell
Contractor : Saipem SA
Repair : J-tube
Size : 2 J-Tube
Date : 1996
System : J-Tube Filler

3.
Owner : Gasunie NV
Contractor : A.HAK, NACAP, VSH, SCHELDEGAS
New : North-South Pipeline 48 inch
Size : >22.000 joints, phase 1
Date : 2009
System : Wrappingband CZH + HI Shield

Description:
Description: Releasing the UV - resistant backing foil before application onto Wrappingband CZH
Description: Filling the annulus space of the J-tube in order to seal the leak at the bell-mouth; as sub-contractor for Saipem SA.
Description: STOPAQ Steam Heated Tank Container on board at the Platform
Description:
Description: